T102N R41W
|
|||
SEC-TWP-RNG |
COR |
DESCRIPTION |
TIES |
1-102-41 |
N 1/4 |
STONE IN 1895, STONE IN 1964 (PLACED WOOD
STAKE) |
1964 |
1-102-41 |
NW |
STONE IN 1895, STAKE IN 1923, STAKE IN 1963 (PLACED IRON
PIN), IRON PIN IN 1964, IRON PIN IN 1966, FOUND IRON STAKE WITH
YELLOW CAP |
1966 2005 R/W POST
N.W. 130.25 STOP SIGN
POST S.W. 56.12 N&D IN
PP N.E. 199.40 N&D IN
PP S.E. 53.90 N = 163671.308 E = 562585.704 |
1-102-41 |
W 1/4 |
STONE IN 1895, STONE IN 1923, STAKE IN 1963
(REESTABLISHED), IRON PIN IN 1964 (RESET), IRON PIN IN 1986 2006 -. LOCATED REBAR WITH
AN UNREADABLE CAP 1 BELOW GRADE IN THE CL OF THE ASPHALT PAVEMENT. - ULTEIG
ENGINEERS INC |
1986 2006 - ULTEIG ENGINEERS
INC. PK NAIL IN SW SIDE OF WOOD POWER POLE N E
49.1 STEEL MAIL BOX POST SW
47.3 PK NAIL NORTH SIDE OF WOOD POWER POLE NW
62.6 NOBLES N = 161118.40 E = 562571.77 |
1-102-41 |
SW |
STAKE IN 1895, STONE IN 1923, STONE IN 1963 (PLACED IRON
PIN), IRON PIN IN 1964, IRON PIN IN 1986, SET A 1 Ό X 1 Ό STEEL
TUBE WITH ALUMINUM CAP STAMPED DNR SURVEY MARKER ON AUG. 9, 1988 DNR
BUREAU OF ENGINEERING |
1986 FD IRON PIN 5/5/2006 |
1-102-41 |
S 1/4 |
STONE IN 1895, FOUND 6 X 5 X 15 GRANITE
STONE WITH X ON TOP DOWN 0.8 AND PLACED A Ύ X 24 IRON ROD ON NORTH SIDE
OF STONE ON AUG. 9, 1988 DNR BUREAU OF ENGINEERING |
1988 DNR BUREAU OF
ENGINEERING DNR N&D TOP 3rd
FE POST N. 43.29 DNR N&D WOOD FE
POST E. 8.10 N&BC IN WOOD BR POST S.E.
1.30 |
1-102-41 |
SE |
IRON PIN IN 1914, SET 1 Ό X 47 IRON PIPE ON
AUG. 10, 1988 DNR BUREAU OF ENGINEERING |
1988 DNR BUREAU OF
ENGINEERING CONC. NAIL TOP 30
CMP S. 43.45 |
1-102-41 |
E 1/4 |
STONE IN 1895, STONE IN 1914, FOUND 60d NAIL INSIDE A Ύ
X 16 ½ IRON PIPE DOWN 0.30 & OLD WOOD STAKE AND PLACED A 1 Ό X 1 Ό
STEEL TUBE WITH ALUMINUM CAP STAMPED DNR SURVEY MARKER ON AUG. 9, 1988
DNR BUREAU OF ENGINEERING |
1988 DNR BUREAU OF
ENGINEERING DNR N&D IN
PP N.W. 35.48 DNR N&D IN COR FE
POST W. 30.51 DNR N&D IN COR FE
POST E. 32.62 |
1-102-41 |
NE |
STONE IN 1893, STONE IN 1914, STONE IN 1964 (PLACED WOOD
STAKE), IRON PIN IN 1965, FOUND Ύ X 15 IRON PIPE DOWN
0.60 OVER A 3 X 8 X 6 GRANITE STONE DOWN 2.0 AND PLACED 1 Ό X 1 Ό
STEEL TUBE WITH ALUMINUM CAP STAMPED DNR SURVEY MARKER ON AUG. 9, 1988
DNR BUREAU OF ENGINEERING |
1970 1988 DNR BUREAU OF
ENGINEERING N&BC IN
PP S.W. 49.82 N&BC IN
PP S.E. 44.69 |
1-102-41 |
CENTER |
STONE IN 1895 |
NONE |
2-102-41 |
N 1/4 |
STONE IN 1895 (SET), FOUND POINTED STONE 24
DEEP AND PLACED 1 IRON PIPE WITH RED SURVEY CAP #43803 OVER TOP OF STONE ON
9-8-05 ZIESKE LAND SURVEYING |
2005 5/8 IRON
PIN S. 32.19 5/8 IRON
PIN N.W. 34.70 5/8 IRON
PIN N.E. 34.95 N = 163632.409 E = 559950.464 |
2-102-41 |
NW |
STONE IN 1895 (SET), STONE IN 1935, FOUND 1 IRON PIPE WITH
YELLOW SURVEY CAP #23008 OVER STONE ON 9-12-05 ZIESKE LAND SURVEYING |
2005 STEEL SIGN
POST N.W. 67.15 STEEL SIGN
POST S.E. 38.95 CTR. TEL.
PED N.E. 52.65 N = 163591.046 E = 557298.066 |
2-102-41 |
W 1/4 |
STONE IN 1898 (SET) 2006 - LOCATED 5/8 REBAR
8 DEEP IN THE CL OF THE GRAVEL ROADWAY - ULTEIG ENGINEERS INC |
NONE 2006 - ULTEIG ENGINEERS INC PK NAIL IN NORHT SIDE OF
POWER POLE NOBLES N = 161157.39 E = 557273.93 FD. REBAR 5/15/2006 |
2-102-41 |
SW |
STONE IN 1896, STONE IN 1898, STAKE IN 1937 2006 - LOCATED 5/8 REBAR 8 DEEP IN CL OF THE N/S GRAVEL ROAD, 3 +/- SOUTH FO THE
CL OF GRAVEL ROADWAY - ULTEIG ENGINEERS INC |
NONE 2006 - ULTEIG ENGINEERS INC PK NAIL IN WEST FACE OF
WOOD FENCE POST E. 32.0 PK NAIL IN NE FACE OF WOOD
FENCE POST S.W. 46.8 TOP CENTER OF TELE-PED N.W.
45.2 NOBLES N = 158508.19 E = 557270.26 FD. 5/15/2006 |
2-102-41 |
CENTER |
NONE |
NONE |
3-102-41 |
N 1/4 |
NONE |
NONE |
3-102-41 |
NW |
STONE IN 1892 (SET), STONE IN 1901, STAKE IN 1937, FOUND Ύ ROD (7 DEEP) IN
1993 (MADSEN SURVEYING), FOUND IRON PIN IN 1997
(ZIESKE LAND SURVEYING) |
1993 (MADSEN SURVEYING) PK NAIL IN
PP N.W. 57.20 PK NAIL IN
PP S.W. 58.15 YIELD SIGN
POST N.E. 60.50 |
3-102-41 |
W 1/4 |
STONE IN 1898 (SET), STONE IN 1901, STAKE IN 1933, IRON PIN IN 1973 PLACED 2 1/2" PK NAIL
IN 2009 (AFTER OVERLAY) |
N&D IN
PP N.W. 75.40 NOBLES N = 161025.341 E = 552028.078 |
3-102-41 |
SW 1/4 |
STONE IN 1898 (SET), STONE IN 1901, STAKE IN 1937, IRON PIN IN 1973 |
N&D IN
PP S.W. 59.66' |
3-102-41 |
S 1/4 |
STONE IN 1898, STAKE IN 1937 |
NONE |
3-102-41 |
CENTER |
STONE IN 1898 |
NONE |
4-102-41 |
N 1/4 |
STONE IN 1892 (SET), STONE IN 1901, FOUND A 5/8 ROD (3 DEEP)
IN 1993 (MADSEN SURVEYING) |
1993 (MADSEN SURVEYING) STL COR
POST N. 33.20 BC IN
PP N.E. 39.80 (N&S FE LINE IS 0.5 E.
OF COR) |
4-102-41 |
NW |
STONE IN 1892 (SET), STONE IN 1901, STONE IN 1911, STONE IN 1937, FOUND A PAINTED STONE WITH
A WOOD STAKE OVER STONE (19 DEEP) SET Ύ O.D. ON N. EDGE OF STONE & Ύ
O.D. X 13 I.P. OVER STONE IN 1993 (MADSEN SURVEYING) |
1993 (MADSEN SURVEYING) BC IN PP BR
POLE N.W. 38.20 BC IN
PP N.E. 46.30 NEAR EDGE TEL
PED S.W. 44.20 BC IN COR FE
P. S.E. 45.40 BC IN PP BR
POLE S.E. 46.75 |
4-102-41 |
W 1/4 |
STONE IN 1901 (SET), STONE IN 1939 |
NONE |
4-102-41 |
SW |
STONE IN 1901, STONE IN 1912, FOUND STONE (24 DEEP)
SET I.P. NEXT TO STONE WITH TOP BENT OVER STONE & SET Ύ O.D. X 15 I.P.
OVER STONE X (4 DEEP) IN 1993 BY MADSEN SURVEYING |
1993 (MADSEN SURVEYING) CL TEL
PED N.W. 46.00 BC IN
PP S.W. 47.35 UNDERGROUND CABLE SIGN
POST N.E. 44.95 BC IN
PP S.E. 65.05 |
4-102-41 |
S 1/4 |
STONE IN 1892, STONE IN 1901, FOUND STONE (48 DEEP)
& SET Ύ O.D. X 24 I.P. OVER STONE IN 1993 (MADSEN SURVEYING) |
1993 (MADSEN SURVEYING) BC IN
PP S.W. 85.30 BC IN
PP S.E. 127.00 (COR IS 1 S. OF CL) (N. & S. FE LINE IS 4
W. OF COR) |
4-102-41 |
CENTER |
STONE IN 1892 (SET), STONE IN 1898 |
NONE |
5-102-41 |
N 1/4 |
STAKE IN 1902, STONE IN 1911, STONE IN 1937 |
NONE |
5-102-41 |
NW |
STONE IN 1911, STONE IN 1937, STONE IN 1952 (PLACED WOOD
STAKE), STAKE IN 1960 (PLACED IRON
PIN), IRON PIN IN 1980 |
1980 |
5-102-41 |
W 1/4 |
STONE IN 1925, IRON PIN IN 1980, 2 1/2" PK NAIL IN 1998 PLACED PK NAIL AFTER
OVERLAY, 2017 |
1998 2017 NOBLES COUNTY
COORDINATES N=160967.12 E=541459.97 |
5-102-41 |
SW |
STONE IN 1902, STONE IN 1937, IRON PIN IN 1952, IRON PIN IN 1960, IRON PIN IN 1980, PLACED STEEL PIN 1991
(AFTER OVERLAY), 2 1/2" PK NAIL IN 1998 PLACED PK NAIL AFTER
OVERLAY, 2017 |
1998 2017 NOBLES COUNTY
COORDINATES N=158317.38 E=541397.35 |
5-102-41 |
S 1/4 |
STONE IN 1902 |
NONE |
5-102-41 |
CENTER |
NONE |
NONE |
6-102-41 |
N 1/4 |
NONE |
NONE |
6-102-41 |
NW |
STONE IN 1940 |
NONE |
6-102-41 |
W 1/4 |
NONE |
NONE |
6-102-41 |
SW |
STAKE IN 1895, STONE IN 1935, STONE IN 1941 |
NONE |
6-102-41 |
S 1/4 |
STONE IN 1935 |
NONE |
6-102-41 |
CENTER |
NONE |
NONE |
7-102-41 |
W 1/4 |
NONE |
NONE |
7-102-41 |
SW |
STONE IN 1959 (PLACED IRON
PIN) 2006 - LOCATED ½ IRON
REBAR, 1 CENTER OF HESSEELROTH AVENUE.
- ULTEIG ENGINEERS INC |
1959 2006 - ULTEIG ENGINEERS
INC. PK NAIL WOOD POWER POLE N.W. 47.1 PK NAIL WOOD POWER
POLE W 39.8 PK NAIL WOOD POWER POLE S.E. 50.4 NOBLES N = 152870.82 E = 536013.26 FD IRON PIN 3/08/2006 |
7-102-41 |
S 1/4 |
STAKE IN 1959 (PLACED IRON
PIN) 2006 - PLACED 5/8 WITH CAP
RLS 44563 - ULTEIG ENGINEERS INC (SEE PAGE 2 OF CORNER
CERTIFICATE) |
1959 2006 - ULTEIG ENGINEERS INC PUNCH MARK ON TOP 12 CMP.
N.W. 83.9 PK NAIL IN WOO POWER POLE S.W. 99.9 NOBLES N = 152963.18 E = 538747.47 FD SET IRON PIN 3/08/2006 |
7-102-41 |
CENTER |
NONE |
NONE |
8-102-41 |
W 1/4 |
STONE IN 1924, STAKE IN 1952, STAKE IN 1960 (PLACED IRON
PIN), IRON PIN IN 1980, PLACED STEEL PIN IN 1991
(AFTER OVERLAY), 2 1/2" PK NAIL IN 1998 PLACED PK NAIL AFTER
OVERLAY, 2017 |
1998
|
8-102-41 |
SW |
STONE IN 1926, STONE IN 1952 (PLACED WOOD
STAKE), IRON PIN IN 1960, IRON PIN IN 1980, PLACED STEEL PIN IN 1991
(AFTER OVERLAY), 2 1/2" PK NAIL IN 1998
|
1998
2017 NOBLES COUNTY COORDINATES N=153006.22 E=541397.82 |
8-102-41 |
S 1/4 |
STONE IN 1897, STONE IN 1959 (PLACED IRON
PIN)
|
1959 |
8-102-41 |
CENTER |
NONE |
NONE |
9-102-41 |
W 1/4 |
IRON PIN IN 1912 (SET) |
NONE |
9-102-41 |
SW |
STONE IN 1897 (SET), STONE IN 1912, STAKE IN 1959 (PLACED IRON PIN) |
1959
|
9-102-41 |
S 1/4 |
NONE |
NONE |
9-102-41 |
CENTER |
NONE |
NONE |
10-102-41 |
W 1/4 |
IRON PIN IN 1973 PLACED 2 1/2" PK NAIL
IN 2009 (AFTER OVERLAY) |
N&D IN
PP S.W. 62.76' NOBLES COUNTY COORDINATES |
10-102-41 |
SW |
IRON PIN IN 1973 |
N&D IN
PP E. 79.30' 2006 - BOLTEN AND MENK |
10-102-41 |
S 1/4 |
STONE IN 1960 |
1960 |
10-102-41 |
CENTER |
NONE |
NONE |
11-102-41 |
W 1/4 |
STONE IN 1896 2006 - LOCATED FIELD STONE
10 DEEP IN THE GRAVEL ROADWAY, SET
5/8 REBAR WITH CAP RLS 44563 - ULTEIG ENGINEERS INC (SEE PAGE 2 OF CORNER
CERTIFICATE) |
NONE 2006 - ULTEIG ENGINEERS INC PK NAIL WOOD POWER POLE N.E. 85.7 PK NAIL WOOD FENCE POST E. 33 TOP CENTER OF TEL-PED S.W.. 34.3 NOBLES N = 155858.33 E = 557262.18 |
11-102-41 |
SW |
STONE IN 1899, STONE IN 1959 (PLACED IRON
PIN)
|
1959
SET IRON PIN 3/06/2006 |
11-102-41 |
S 1/4 |
STONE IN 1896, STONE IN 1959 (PLACED IRON
PIN) 2006 LOCATED 1 IRON
PIPE, 5 DEEP, CL GRAVEL ROADWAU, PERP. TO FENCELINE SOUTH. - ULTEIG
ENGINEERS INC CORNER CERTIFICATE (2006 - ULTEIG) CORNER
CERTIFICATE (2006 -BOLTEN AND MENK) |
1959 2006 - ULTEIG ENGINEERS INC. CL FIELD ENTRANCE E
13+/- END OF ENTRANCE CULVERT S.E. 40.3 END OF ENTRANCE CULVERT S.E. 26.1 PK NAIL WOOD POWER POLE S.W. 50.1 N = 153193.91 E = 559876.55
FD. IRON PIPE 5/16/2006 |
11-102-41 |
CENTER |
STONE IN 1896 |
NONE |
12-102-41 |
W 1/4 |
STONE IN 1896, STAKE IN 1923, STAKE IN 1963 (PLACED IRON
PIN), IRON PIN IN 1964, IRON PIN IN 1986, SET A 1 Ό X 1 Ό STEEL
TUBE WITH ALUMINUM CAP STAMPED DNR SURVEY MARKER ON AUG. 9, 1988 DNR
BUREAU OF ENGINEERING |
1986 PUNCH HOLE N. END
CMP S.E. 34.67 R/W
SIGN W. 49.8 |
12-102-41 |
SW |
STONE IN 1896, STAKE IN 1923, STAKE IN 1959 (PLACED IRON
PIN), IRON PIN IN 1964, IRON PIN IN 1966, IRON PIN IN 1986, FOUND ½ IRON ROD DOWN 1.8
OVER A 0.7 X 0.4 X 1.2 STONE DOWN 3.5 AND PLACED A 1 Ό X 1 Ό STEEL TUBE
WITH ALUMINUM CAP STAMPED DNR SURVEY MARKER OVER IRON ROD ON SEPT. 19, 1988
DNR BUREAU OF ENGINEERING CORNER
CERTIFICATE CORNER
CERTIFICATE (2006) |
1986 1988 DNR BUREAU OF
ENGINEERING TOP TEL
PED N.W. 121.15 SRP IN
PP N.E. 138.83 PK NAIL IN N. END OF 72
CMP N.E. 46.61 PK NAIL IN S. END OF 72
CMP S.E. 46.74 SRP IN
PP S.E. 74.71
|
12-102-41 |
S 1/4 |
IRON PIN IN 1963, FOUND ½ IRON ROD DOWN 0.5
AND PLACED A 1 Ό X 1 Ό STEEL TUBE WITH ALUMINUM CAP STAMPED DNR SURVEY
MARKER OVER IRON ROD ON AUG. 8, 1988 DNR BUREAU OF ENGINEERING 2006 - NOTHING LOCATED,
PLACED 3/4" X 18" IRON PIPE MONUMENT USING INFORMATION PROVIDED ON
PREVIOUS DNR CERTIFICATE. - BOLTEN AND MENK. (SEE SHEET 2 OF CORNER
CERTIFICATE) CORNER
CERTIFICATE (1988) SET IRON PIPE W/ CAP 23008 |
1988 - DNR BUREAU OF
ENGINEERING PUNCH HOLE TOP N. END 15
CMP N. 12.13 PUNCH HOLE TOP S. END 15
CMP S. 11.88 DNR N&D IN
PP S. 34.31 2006 - BOLTEN AND MENK |
12-102-41 |
SE |
STONE IN 1914, STONE IN 1959 (PLACED IRON
PIN), FOUND 3/8 SQUARE BOLT OVER
A Ύ X 1.8 IRON ROD OVER A 1.3 X 0.5 X 0.2 FLAT CUT STONE DOWN 2.5 AND
PLACED A 1 Ό X 1 Ό STEEL TUBE WITH ALUMINUM CAP STAMPED DNR SURVEY MARKER
OVER BOLT ON AUG. 8, 1988 DNR BUREAU OF ENGINEERING |
1970 1988 DNR BUREAU OF
ENGINEERING DNR N&D IN COR FE
POST S.W. 47.84 CHISELED |
12-102-41 |
E 1/4 |
STONE IN 1914, SET 1 Ό X 1 Ό STEEL TUBE
WITH ALUMINUM CAP STAMPED DNR SURVEY MARKER ON AUG. 8, 1988 DNR BUREAU OF
ENGINEERING |
1988 DNR BUREAU OF
ENGINEERING DNR N&D IN WOOD FE
POST S. 8.73 DNR N&D IN WOOD COR FE
POST W. 1.27 DNR N&D IN COR FE
POST E. 50.16 |
12-102-41 |
CENTER |
NONE |
NONE |
13-102-41 |
W 1/4 |
STAKE IN 1923, STAKE IN 1959 (PLACED IRON
PIN), IRON PIN IN 1964 2006 - LOCATED PK NAIL AT
CL OF ASPHALT PAVEMENT IN LINE WITH FENCE LINES EAST & WEST. - ULTEIG
ENGINEERS INC. 2006 - LOCATED CAST IRON
MONUMENT (BROKEN) - BOLTEN AND MENK (SEE SHEET 2 OF CORNER CERTIFICATE) CORNER
CERTIFICATE CORNER
CERTIFICATE (2006 - BOLTEN
AND MENK) 2006 SET SURVEY MARKER
SPIKE (#23008) |
1964 2006 - ULTEIG ENGINEERS INC. PK NAIL SOUTH FACE OF
SQUARE WOOD GUARD RAIL POST N.E. 83.3 PK NAIL TOP OF SQUARE WOOD
GUARD RAIL POST S.E. 33.3 PK NAIL TOP OF SQUARE WOOD
GUARD RAIL POST S.W. 33.1 NOBLES COUNTY COORDINATES N = 150534.80 E = 562513.15
FD. IRON PIN 5/16/2005 |
13-102-41 |
SW |
STONE IN 1914 (SET), STONE IN 1917, STONE IN 1923, STONE IN 1930,
"X" IN CONC. IN 1960, BRASS PLUG IN 1964, IRON PIN IN 1973, FOUND PIN IN 1991, FOUND ROD IN 1996 (MADSEN
SURVEYING) |
1996 |
13-102-41 |
S 1/4 |
STONE IN 1914 (SET), STONE IN 1917, IRON PIN IN 1963, IRON PIN IN 1973
FD W/CAP #26748 |
2006
- BOLTON AND MENK |
13-102-41 |
SE |
STONE IN 1901, STONE IN 1914 (SET), "X" IN SLAB IN
1963 |
NONE |
13-102-41 |
E 1/4 |
STONE IN 1914, IRON PIN IN 1963 2006 SET IRON PIN W/CAP
#23008 |
NONE |
13-102-41 |
CENTER |
IRON PIN IN 1963 |
NONE |
14-102-41 |
W 1/4 |
IRON PIN IN 1960 2006 - LOCATED CAST IRON
MONUMENT (BROKEN) - BOLTEN AND MENK (SEE SHEET 2 OF CORNER CERTIFICATE) |
NONE FD. SET AN IRON PIN
3/07/2006 |
14-102-41 |
SW |
STONE IN 1917, IRON PIN IN 1960
(ESTABLISHED), CONC NAIL IN 1978 (MARTIN
SURVEYING), DUG FOR COR - FOUND NOTHING
- CHECKED TIES & SET 5/8" X 4" REBAR ON 3-27-1992 2006 - LOCATED 5/8"
REROD 2003, PLACED 3/4" X 18" IRON PIPE MONUMENT, REBAR LOST DUE TO
CONSTRUCTION. BOTON AND MENK (SEE SHEET 2 OF CORNER CERTIFICATE) |
R/W
MARKER S.E. 71.28' 2006 - BOLTON AND MENK |
14-102-41 |
S 1/4 |
STONE IN 1916 (SET), STONE IN 1917, "X" IN CONC IN
1960 (ESTABLISHED), IRON PIN IN 1973, PLACED 5/8" X 4"
REBAR ON 3-26-1992, FOUND 5/8" ROD IN 1996
AT SURFACE (MADSEN SURVEYING) 2006 - LOCATED 5/8" REBAR 2003, PLACED
3/4" X 18" IRON PIPE MONUMENT AFTER ROADWAY CONSTRUCTION. BOLTON
AND MENK. (SEE SHEET 2 OF CORNER CERTIFICATE) |
1996
|
14-102-41 |
CENTER |
NONE 2006 - SET 5/8 REBAR WITH
CAP ID. RLS 44563 - ULTEIG ENGINEERS
INC (SEE PAGE 2 OF CORNER
CERTIFICATE) |
NONE 2006 - ULTEIG ENGINEERS INC PK NAIL IN WOOD FENCE POST S. 7.0 PK NAIL TOP OF WOOD FENCE
POST S.E. 15.1 PK NAIL TOP OF WOOD FENCE POST S.W. 32.0 NOBLES |
15-102-41 |
W 1/4 |
IRON PIN IN 1973
|
NONE
|
15-102-41 |
SW |
HOLE IN CONC IN 1959, IRON PIN IN 1973, CONC NAIL IN 1978 (MARTIN
SURVEYING), FOUND CONC NAIL THAT DIDN'T
FIT TIES - FOUND HOLE IN CONC PLACED 5/8" X 4" REBAR ON 3-26-1992 PLACED 2 1/2" PK NAIL
IN 2009 (AFTER OVERLAY) |
N&D IN
PP S.E. 52.35' |
15-102-41 |
S 1/4 |
CONC NAIL WITH BRASS TAG IN
1978, FOUND NAIL IN 2nd LIFT DN -
MAY OR MAY NOT BE IT - CONCRETE BUSTED UP - NO TIES FOUND - SLIVER OF IRON
NEXT TO CONC - NOTHING WAS FOUND TO INDICATE CORNER WAS POSITIVELY THERE -
PLACED 5/8" X 4" REBAR ASSUMED |
TOP OF
UGTCM S. 50.33' |
15-102-41 |
CENTER |
NONE |
NONE |
16-102-41 |
W 1/4 |
STONE IN 1897 (SET), IRON PIN IN 1959
|
NONE |
16-102-41 |
SW |
STONE IN 1897, STONE IN 1901, HOLE IN CONC IN 1959
(ESTABLISHED), FOUND IRON PIN - PLACED BY
BELL - DUG DOWN TO HOLE IN CONC - PLACED PK ON TOP OF IRON PIN ON 3-22-1992 |
N&D IN
PP S.W. 68.45' |
16-102-41 |
S 1/4 |
HOLE IN CONC IN 1959
(ESTABLISHED), PLACED 5/8" X 4"
REBAR - TOP OF PIN JUST BELOW SURFACE 2-25-92, FOUND 5/8 IRON ROD (2
DEEP) IN BIT. PAVING ON SEPT. 28, 1999 MADSEN LAND SURVEYING |
1992 2.5' N. OF CL TH 16 1999 (MADSEN LAND
SURVEYING) TEL
PED S.E. 71.14 STEEL COR FE
POST N. 47.25 |
16-102-41 |
CENTER |
NONE |
NONE |
17-102-41 |
W 1/4 |
STONE IN 1952 (PLACED WOOD
STAKE), STAKE IN 1960 (PLACED IRON
PIN), IRON PIN IN 1980 2006 - PLACED 5/8 REBAR
WITH CAP ID. RLS 44563 - ULTEIG ENGINEERS INC (SEE PAGE 2 OF CORNER
CERTIFICATE) PLACED PK NAIL AFTER
OVERLAY, 2017 |
1980 2006 - ULTEIG ENGINEERS INC PK NAIL IN WOOD POWER POLE N.W. 47.1 PK NAIL IN WOOD POWER
POLE W. 39.8 PK NAIL IN WOOD POWER POLE S. 50.4 NOBLES N = 150351.47 E = 541398.78 2017 NOBLES COUNTY
COORDINATES N=150351.43 E=541398.88 |
17-102-41 |
SW |
IRON PIN IN 1897, IRON PIN IN 1912, BRASS PLUG IN 1960, BRASS PLUG IN 1967, IRON PIN IN 1973, IRON PIN IN 1987, PLACED 5/8" X 4" REBAR
ON 3-23-1992, FOUND PK NAIL IN BIT PAVING
ON SEPT. 28, 1999 MADSEN LAND SURVEYING
|
1973 1999 (MADSEN LAND
SURVEYING) BC IN
PP S.E. 52.34 BC IN
PP N.W. 67.97 NOBLES COUNTY 61 SIGN
POST N.E. 125.50 |
17-102-41 |
S 1/4 |
STONE IN 1897 (SET), STONE IN 1912, IRON PIN IN 1959
(ESTABLISHED), IRON PIN IN 1973, PLACED 5/8" X 4"
REBAR ON 3-23-1992
|
1973 |
17-102-41 |
CENTER |
STONE IN 1897 (SET), STONE IN 1959 (PLACED IRON
PIN) |
NONE |
18-102-41 |
W 1/4 |
NONE 2006 - PLACED 5/8 REBAR
WITH ID. RLS 44563 - ULTEIG ENGINEERS INC (SEE PAGE 2 OF CORNER
CERTIFICATE) |
NONE 2006 - ULTEIG ENGINEERS INC PK NAIL WOOD FENCE
POST N 4.8 PK NAIL WOOD FENCE
POST NE 12.1 PK NAIL WOOD FENCE PST N.W. 14 NOBLES N = 150232.37 E = 536016.53 SET AN IRON PIN 3/08/2006 |
18-102-41 |
SW |
IRON PIN IN 1912, BRASS PLUG IN 1959, IRON PIN IN 1973 2006 - LOCATED 1 IRON PIPE - ULTEIG ENGINEERS INC |
1973 2006 - ULTEIG ENGINEERS
INC. PK NAIL WOOD POWER POLE N.E. 79.7 MAILBOX POST S.W. 43.6 PK NAIL IN WOOD TEL-PED POST N.W. 81.7 NOBLES N = 147586.95 E = 536011.74 FD. IRON PIN 3/07/2006 |
18-102-41 |
S 1/4 |
IRON PIN IN 1912, BRASS PLUG IN 1959, IRON PIN IN 1973 2006 - LOCATED 5/8 REBAR
AT INTERSECTION OF HWY#35 AND IVERS AVENUE - ULTEIG ENGINEERS INC |
1973 2006 - ULTEIG ENGINEERS INC PK NAIL IN POWER POLE N.E. 80 PK NAIL IN POWER POLE S.E. 88.1 HEAD OF BOLT IN STEEL SIGN POST S.W. 94.2 NOBLES N = 147635.04 E = 538724.11 FD. IRON PIN 3/23/2006 |
18-102-41 |
CENTER |
NONE |
NONE |
19-102-41 |
W 1/4 |
NONE |
NONE |
19-102-41 |
SW |
NONE |
NONE |
19-102-41 |
S 1/4 |
NONE |
NONE |
19-102-41 |
CENTER |
IRON PIN IN 1924 |
NONE |
20-102-41 |
S 1/4 |
IRON PIN IN 1896 |
NONE |
20-102-41 |
W 1/4 |
STAKE IN 1923, STAKE IN 1945, STAKE IN 1967 (PLACED 2X2) PLACED
PK NAIL IN 2016 (AFTER OVERLAY) |
1967 |
20-102-41 |
SW |
STAKE IN 1923, IRON PIN IN 1939, IRON PIN IN 1953, IRON PIN IN 1960, IRON PIN IN 1967, IRON PIN IN 1987 PLACED
PK NAIL IN 2016 (AFTER OVERLAY) |
1967 |
20-102-41 |
CENTER |
STONE IN 1896 |
NONE |
21-102-41 |
W 1/4 |
STONE IN 1896, STONE IN 1901, STONE IN 1950 |
NONE |
21-102-41 |
SW |
STONE IN 1896, STONE IN 1901 |
NONE |
21-102-41 |
S 1/4 |
STONE IN 1901, FOUND STONE IN 1978 (PLACED
IRON PIN) |
(MARTIN SURVEYING) |
21-102-41 |
CENTER |
NONE |
NONE |
22-102-41 |
W1/4 |
STONE IN 1901
|
|
22-102-41 |
SW |
NONE |
NONE |
22-102-41 |
S 1/4 |
NONE |
NONE |
22-102-41 |
CENTER |
NONE |
NONE |
23-102-41 |
W 1/4 |
STONE IN 1916 (SET), STONE IN 1980 (PLACED IRON
PIN) |
1980 |
23-102-41 |
SW |
STONE IN 1916 (SET), STONE IN 1938 |
NONE |
23-102-41 |
CENTER |
STONE IN 1916 (SET) |
NONE |
24-102-41 |
W 1/4 |
STONE IN 1914 (SET), STONE IN 1916, IRON PIN IN 1930, IRON PIN IN 1964 (REESTABLISHED),
IRON PIPE IN 1971, PLACED 5/8" X 12"
REBAR IN 1991, PLACED 5/8" X 4"
REBAR IN 1992 INTO NEW BIT. |
1992 |
24-102-41 |
SW |
STONE IN 1914, STONE IN 1916, STONE IN 1939, IRON PIN IN 1964 (PLACED
WOOD STAKE), IRON PIPE IN 1971, FOUND IRON PIN IN 1985, PLACED 5/8" X 12"
REBAR IN 1991, PLACED 5/8" X 4"
REBAR IN 1992 INTO NEW BIT. |
1992 |
24-102-41 |
S 1/4 |
STONE IN 1914, STONE IN 1939 |
NONE |
24-102-41 |
SE |
STONE IN 1914, STONE IN 1933, STONE IN 1939 |
NONE |
24-102-41 |
E 1/4 |
STONE IN 1901 (SET), STONE IN 1914, STONE IN 1963 (PLACED IRON
PIN) |
NONE |
24-102-41 |
CENTER |
STONE IN 1914 (SET), STONE IN 1963 (PLACED IRON
PIN) |
NONE |
25-102-41 |
W 1/4 |
STONE IN 1914, STONE IN 1916, STONE IN 1930, STONE IN 1964 (PLACED IRON
PIN), IRON PIPE IN 1971, PLACED 5/8" X 12"
REBAR IN 1991, PLACED 5/8" X 4"
REBAR IN 1992 INTO NEW BIT. FOUND 5/8 REBAR IN 2018 |
1992 2018 N=139952.41 E=562519.39 |
25-102-41 |
SW |
STONE IN 1914, STONE IN 1930, STONE IN 1939, STONE IN 1964 (PLACED WOOD
STAKE), IRON PIPE IN 1971, PLACED IRON PIN IN 1983
AFTER CONSTRUCTION, PLACED 5/8" X 12"
REBAR IN 1991, PLACED 5/8" X 4"
REBAR 1992 INTO NEW BIT, FOUND IRON PIN IN 1997 BY MADSEN
LAND SURVEYING FOUND 5/8 REBAR IN 2018 |
1992 1997 MADSEN LAND SURVEYING BC IN
PP S.E. 68.70 BC IN
PP S.W. 68.12 TOP R/W
POST N.E. 69.75 2018 N=137320.87 E=562512.29 |
25-102-41 |
S 1/4 |
STONE IN 1914, STONE IN 1939, IRON PIN IN 1967 (ASSUMED),
FOUND PIN IN 1983, FOUND PIN IN 1995, PLACED 3/4" X 3" REBAR
AFTER PAVING IN 1995, FOUND IRON PIN IN 1997 BY
MADSEN LAND SURVEYING |
1995 1997 MADSEN LAND SURVEYING BC IN
PP S.W. 94.65 BC IN
PP S.E. 114.95 |
25-102-41 |
SE |
STONE IN 1888, STONE IN 1914, STONE IN 1936, IRON PIN IN 1967 (ASSUMED),
FOUND IRON PIN IN 1967
(ASSUMED), FOUND IRON PIN IN 1983, FOUND IRON PIN IN 1995
(PLACED 3/4" X 3" REBAR AFTER PAVING) |
1995 |
25-102-41 |
E 1/4 |
STONE IN 1914, STONE IN 1930, STONE IN 1939 |
NONE |
25-102-41 |
CENTER |
STONE IN 1914, STONE IN 1939 |
NONE |
26-102-41 |
W 1/4 |
STONE IN 1916, STONE IN 1938 |
NONE |
26-102-41 |
SW |
STONE IN 1893, STONE IN 1937, STONE IN 1980 (PLACED IRON
PIN) |
1980 |
26-102-41 |
S 1/4 |
STONE IN 1914 (SET), STONE IN 1916 SET 5/8 X 18 IRON STAKE
W/CAP NO. 22461 IN 2018 |
NONE 2018 N=137328.10 E=559841.83 |
26-102-41 |
CENTER |
STONE IN 1916 FOUND 6 X 6 STONE W/
STEEL FENCE POST IN 2018 |
NONE 2018 N=139965.60 E=559857.23 |
27-102-41 |
W 1/4 |
STONE IN 1894, FOUND NOTHING IN 1978 (SET
IRON PIN) |
(MARTIN LAND SURVEYING) |
27-102-41 |
SW |
FOUND STONE IN 1978 (PLACED
IRON PIN), FOUND Ύ O.D. IRON PIN WITH
CAP (6 DEEP) IN 1992 BY MADSEN SURVEYING |
(MARTIN LAND SURVEYING) 1992 (MADSEN SURVEYING) WARNING
POST N.W. 51.95 BC IN
PP S.W. 51.20 STL FE POST
S.E. 43.35 BC IN COR FE
POST N.E. 42.44 |
27-102-41 |
S 1/4 |
STAKE IN 1893 |
NONE |
27-102-41 |
CENTER |
NONE |
NONE |
28-102-41 |
W 1/4 |
STONE IN 1894, FOUND STONE IN 1978 (PLACED
IRON PIN) |
(MARTIN LAND SURVEYING) |
28-102-41 |
SW |
STONE IN 1894, FOUND NOTHING IN 1978
(PLACED IRON PIN), FOUND ½ REBAR (10 DEEP)
IN 1992 (MADSEN SURVEYING) |
(MARTIN LAND SURVEYING) 1992 (MADSEN SURVEYING) PP
N.W. 55.70 PP
S.W. 45.00 CL TEL
PED N.E. 43.80 PP
S.E. 57.80 |
28-102-41 |
S 1/4 |
FOUND NOTHING IN 1978 (SET
IRON PIN) |
(MARTIN LAND SURVEYING) |
28-102-41 |
CENTER |
NONE |
NONE |
29-102-41 |
W 1/4 |
STAKE IN 1923, STAKE IN 1945 (PLACED IRON
PIN), IRON PIN IN 1957, IRON PIN IN 1960, IRON PIN IN 1967, IRON PIN IN 1972 (PLACED
12" IRON PIN), IRON PIN IN 1987 PLACED
PK NAIL IN 2016 (AFTER OVERLAY) |
1972 NOBLES COUNTY
COORDINATES N = 139710.01 E = 541268.31 |
29-102-41 |
SW |
STONE IN 1936 (PLACED WOOD
STAKE), STAKE IN 1945 (PLACED IRON
PIN), IRON PIN IN 1957, IRON PIN IN 1960, IRON PIN IN 1967, IRON PIN IN 1972 (PLACED
12" IRON PIN), IRON PIN IN 1987 PLACED
PK NAIL IN 2016 (AFTER OVERLAY) |
1972 NOBLES COUNTY
COORDINATES N = 137059.36 E = 541211.68 |
29-102-41 |
S 1/4 |
NONE |
NONE |
29-102-41 |
CENTER |
NONE |
NONE |
30-102-41 |
W 1/4 |
NONE |
NONE |
30-102-41 |
SW |
STONE IN 1900, STONE IN 1936 |
NONE |
30-102-41 |
S 1/4 |
STONE IN 1936 |
NONE |
30-102-41 |
CENTER |
NONE |
NONE |
31-102-41 |
W 1/4 |
STONE IN 1900 (SET), STONE IN 1936 |
NONE |
31-102-41 |
SW |
STONE IN 1900, STONE IN 1936, STONE IN 1939, FOUND STONE & PLACED
IRON PIN IN 1979 |
1979 |
31-102-41 |
S 1/4 |
STONE IN 1936 |
NONE |
31-102-41 |
CENTER |
POST IN 1936 (SET) |
NONE |
32-102-41 |
W 1/4 |
STAKE IN 1936, STAKE IN 1972 (PLACED
12" IRON PIN), IRON PIN IN 1987 PLACED
PK NAIL IN 2016 (AFTER OVERLAY) |
1972 NOBLES COUNTY
COORDINATES N = 134387.47 E = 541203.41 |
32-102-41 |
SW |
STONE IN 1900, STONE IN 1912, STONE IN 1936 (PLACED WOOD
STAKE), STAKE IN 1945, STAKE IN 1957 (PLACED IRON
PIN), IRON PIN IN 1960, IRON PIN IN 1967, IRON PIN IN 1970 (PLACED
12" IRON PIN) PLACED
PK NAIL IN 2016 (AFTER OVERLAY) |
1972 NOBLES COUNTY
COORDINATES N = 131716.03 E = 541195.72 |
32-102-41 |
S 1/4 |
NONE |
NONE |
32-102-41 |
CENTER |
NONE |
NONE |
33-102-41 |
W 1/4 |
FOUND POINTED STONE (25
DEEP) SET IRON ROD ON S. SIDE OF STONE & SET Ύ O.D. X 20 IRON
MONUMENT OVER STONE IN 1992 BY MADSEN SURVEYING |
1992 (MADSEN SURVEYING) BC IN TEL PED
POST N.W. 48.50 BC IN
PP S.E. 58.10 NW COR ELEC
TRANS. E. 25.45 |
33-102-41 |
SW |
IRON PIN IN 1938, IRON PIN IN 1941, FOUND ½ ROD (15 DEEP) RAISED
TO (5 DEEP) IN 1992 BY MADSEN SURVEYING |
1992 (MADSEN SURVEYING) BC IN WOOD FE
POST N.W. 44.60 SW COR ELEC TRANS.
BOX N.E. 98.40 BC IN
PP S.E. 50.85 |
33-102-41 |
S 1/4 |
IRON PIN IN 1941 |
NONE |
33-102-41 |
CENTER |
NONE |
NONE |
34-102-41 |
W 1/4 |
CORNER POSITION IS ON N.
EDGE OF CREEK BANK DETERMINED POSITION AT MIDWAY SPLIT BETWEEN SECTION
CORNERS DID NOT SET CORNER BECAUSE IT WOULD WASH OUT BY CREEK ACTION
(1992 MADSEN SURVEYING) |
1992 (MADSEN SURVEYING) NW COR OF SEC 34-102-41 IS
2642.51 N. SW COR OF SEC 34-102-41 IS
2642.51 S. (DETERMINED POSITION IS 22
W. OF CL) |
34-102-41 |
SW |
STONE IN 1951 (PLACED WOOD
STAKE), FOUND IRON PIN IN
1979, FOUND 5/8 ROD (8 DEEP) IN
1992 (MADSEN SURVEYING) |
1979 1992 (MADSEN SURVEYING) BC IN COR
POST S.W. 43.75 (COR IS 65.5 E. OF S. ROAD
INTERSECTION) |
34-102-41 |
S 1/4 |
STAKE IN 1893, STONE IN 1888, STONE IN 1951 (PLACED IRON
PIN), PLACED IRON PIN IN 1979 |
1979 |
34-102-41 |
CENTER |
STAKE IN 1893 |
NONE |
35-102-41 |
W 1/4 |
NONE |
NONE |
35-102-41 |
SW |
STONE IN 1888, STONE IN 1935 (PLACED WOOD
STAKE), STAKE IN 1937, STAKE IN 1952 (PLACED IRON
PIN) |
NONE |
35-102-41 |
S 1/4 |
STONE IN 1888, STONE IN 1914 |
NONE |
35-102-41 |
CENTER |
STONE IN 1914 (SET) |
NONE |
36-102-41 |
W 1/4 |
STONE IN 1914, STONE IN 1930, IRON PIN IN 1964 (REESTABLISHED),
IRON PIPE IN 1971, PLACED 5/8" X 12"
REBAR IN 1991, PLACED 5/8" X 4"
REBAR IN 1992 INTO NEW BIT |
1992 |
36-102-41 |
SW |
STONE IN 1888, STONE IN 1914, STONE IN 1931, STONE IN 1964 (PLACED IRON
PIN), IRON PIN IN 1971, PLACED 5/8" X 12"
REBAR IN 1991, PLACED 5/8" X 4"
REBAR IN 1992 INTO NEW BIT |
1992 |
36-102-41 |
S 1/4 |
STONE IN 1931, STONE IN 1963 (PLACED WOOD
STAKE), WOOD STAKE IN 1969 (PLACED
11" BRIDGE PIN) |
1969 |
36-102-41 |
SE |
STONE IN 1888, STONE IN 1912, STONE IN 1931, STONE IN 1963 (PLACED WOOD
STAKE), STONE/WOOD STAKE IN 1969
(PLACED 2' 1/2" IRON PIN) |
1969 |
36-102-41 |
E 1/4 |
STONE IN 1912 (SET) |
NONE |
36-102-41 |
CENTER |
NONE |
NONE |