T104N R41W

SEC-TWP-RNG

COR

DESCRIPTION

TIES

1-104-41

N 1/4

STAKE IN 1962

 

1962
N&D IN PP COR FE POST     N.W.  49.75'
N&D IN COR FE POST     N.E.  51.65'

1991
"X" IN FE ENT PIPE     S.W.  35.75'
"X" IN FE ENT PIPE     S.E.  35.09'

1-104-41

NW

STONE IN 1928,

STAKE IN 1962,

IRON PIPE IN 1970

 

2018 FOUND 5/8” REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

1962
N&D IN TOP COR FE POST     S.W.  43.15'
N&D IN TP     N.W.  36.45'
TOP STEEL FE POST     N.E.  37.15'

 

2018

SET 3/8” REBAR NW 70.08’

SET 3/8” REBAR NE 57.51’

SET 3/8” REBAR SE 56.31’

1-104-41

W 1/4

STAKE IN 1962,

IRON PIPE IN 1970

 

2018 FOUND REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1970
2X2 HUB     S.W.  30.41'
FACE OF R/W SIGN     E.  49.58'

 

2018

SET 3/8” REBAR NW 42.95’

BASE OF SIGN POST SE 49.58’

SET MAG IN CMP SW 34.96’

 

N=224573.974’   E=562656.563’

1-104-41

SW

STONE IN 1901,

STONE IN 1928,

STAKE IN 1962,

IRON PIPE IN 1970,

PLACED 3/4" X 18" REBAR IN 1993

 

2018 FOUND REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1970
N&D IN PP     N.E.  58.05'
N&D IN PP     S.E.  59.28'
NAIL DOWN CL CO RD #70     W.  103.80'
NAIL DOWN CL CO RD #70     W.  206.68'
NAIL DOWN CL CO RD #70     E.  101.93'
NAIL DOWN CL CO RD #70     E.  205.51'
BOTTOM BOLT YIELD SIGN     S.W.  55.28'

 

2018

SW COR OF ELEC BOX NE 63.60’

SET MAG IN CMP SE 73.22’

S QTR COR 2-104-41 W 2624.74’

 

N=221918.881’   E=562659.431’

1-104-41

S 1/4

NONE

NONE

1-104-41

SE

STONE IN 1898,

STONE IN 1930,

STONE IN 1937

NONE

1-104-41

E 1/4

STONE IN 1898

NONE

1-104-41

NE

STONE IN 1893

NONE

1-104-41

CENTER

NONE

NONE

2-104-41

N 1/4

STONE IN 1893

NONE

2-104-41

NW

STONE IN 1893

NONE

2-104-41

W 1/4

NONE

 

2018 SET 5/8” CAPPED REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

T-POST NW 133.05’

T-POST E 98.83’

2-104-41

SW

STONE IN 1932,

STONE IN 1940 (PLACED WOOD STAKE),

FOUND 2X2 HUB/STONE 28" DOWN IN 1977,

PLACED 24" IRON PIN IN 1980

 

2018 FOUND REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

1980
N&D IN PP     N.W.  47.65'
N&D IN UGTCM     S.E.  46.27'
"X" IN CL N. END     W.  46.60'
"X" IN CL CULV S. END     W.  46.29'

 

2018

FOUND X IN RCP NW 46.60’

FOUND X IN RCP SW 46.29’

CENTER OF TELE PED SE 45.81’

2-104-41

S 1/4

FOUND 4X4 HUB 12" DOWN IN 1977,

PLACED 24" IRON PIN IN 1980

 

2018 FOUND 5/8” REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

1980
"X" IN CL CULV N. END     N.E.  130.90'
"X" IN CL CULV S. END     S.E.  130.47'

 

2018

FOUND X IN RCP NE 130.90’

FOUND X IN RCP SE 130.47’

SET 3/8” REBAR SW 54.89’

2-104-41

CENTER

NONE

NONE

3-104-41

N 1/4

FOUND CONC MONUMENT 14" DOWN,

PLACED BRIDGE PIN IN 1977

N&D IN PP     S.W.  45.96'
N&D IN PP     N.W.  43.76'

3-104-41

NW

STONE IN 1892 (SET),

STONE IN 1932,

FOUND STONE 10" DOWN IN 1977,

PLACED 5/8" X 24" IRON PIN IN 1980

 

2018 FOUND 5/8” REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

1980
N&D IN PP     N.W.  55.37'
PUNCH HOLE IN CMP IN FE ENT     S.W.  54.71'
BOTTOM BOLT ON RIGHT POST
WARNING SIGN     N.  34.18'

 

2018

FOUND BOLT ON SIGN POST N 34.18’

FOUND HOLE IN CMP SW 54.71’

SET 3/8” REBAR SE 47.92’

3-104-41

W 1/4

STONE IN 1892 (SET),

COULD NOT FIND IN 1977

NONE

3-104-41

SW

STAKE IN 1892,

FOUND STAKE 20" DOWN,

PLACED 5/8" X 24" IRON PIN IN 1980

 

2018 FOUND REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

1980
N&D IN PP     N.W.  44.92'
PUNCH HOLE ON TOP CMP IN FE ENT     N.W.  79.26'
BOTTOM BOLT IN YIELD SIGN     S.E.  46.68'

 

2018

FOUND HOLE IN CMP NW 79.10’

FOUND BOLT IN SIGN POST SE 45.59’

SET MAG IN PP SW 92.64’

3-104-41

S 1/4

FOUND SPIKE 12" DOWN IN 1977,

PLACED 5/8" X 24" IRON PIN IN 1980

 

2018 FOUND 1/2” REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

1980
NE COR (WPAP PLATE) ON S. SIDE OF BRIDGE     W.  39.25'
E FACE OF NE COR GUARD RAIL N SIDE OF BRIDGE     W.  37.40'

 

2018

BROKEN PIPE CENTER OF HEADWALL NW 47.47’

BROKEN PIPE CENTER OF HEADWALL SW 47.36’

SET 3/8” REBAR NE 34.64’

3-104-41

CENTER

NONE

NONE

4-104-41

N 1/4

STAKE IN 1892 (SET)

NONE

4-104-41

NW

STONE IN 1892 (SET),

STONE IN 1895,

STONE IN 1932

 

2018 FOUND 1” PIPE – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SET 3/8” REBAR NW 47.14’

SET 3/8” REBAR SW 58.55’

SET 3/8” REBAR SE 60.00’

4-104-41

W 1/4

STONE IN 1892 (SET),

STONE IN 1895

 

2018 FOUND RR SPIKE – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SET X IN HEADWALL NW 26.31’

SET X IN HEADWALL NE 25.82’

FOUND ALUMINUM CAP MONUMENT W 32.06’

4-104-41

SW

STAKE IN 1892,

STONE IN 1932 (PLACED WOOD STAKE),

FOUND 2X2 HUB & STONE 28" DOWN IN 1977,

PLACED 5/8" X 24" IRON PIN IN 1980

 

2018 FOUND REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

1980
TOP OF UGTCM     N.W.  88.48'
BOTTOM BOLT YIELD SIGN     N.W.  75.46'
BOTTOM BOLT YIELD SIGN     S.E.  53.82'

 

2018

S QTR COR 5-104-41 W 2627.54’

S QTR COR 4-104-41 E 2647.35’

SET 3/8” REBAR SW 55.36’

4-104-41

S 1/4

STAKE IN 1892,

COULD NOT FIND IN 1977 (ASSUMED),

PLACED 5/8" X 24" REROD IN 1980

1980
PUNCH HOLE IN CMP     N.W.  37.05'
PUNCH HOLE IN CMP     S.E.  34.90'
N&D IN PP     N.E.  142.18'

4-104-41

CENTER

STONE IN 1892

NONE

5-104-41

N 1/4

STONE IN 1895,

STAKE IN 1950,

STAKE IN 1960

1960
N&D IN COR FE POST     S.E.  52.40'
2X2 BY 3rd FE POST     W.  45.45'

5-104-41

NW

STONE IN 1894 (SET),

IRON PIN IN 1950,

IRON PIN IN 1960 (PLACED WOOD STAKE),

IRON PIN IN 1980

 

2018 FOUND PK NAIL – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

1980
N&D IN PP     S.W.  60.53'
N&D IN COR FE POST     S.E.  61.99'
N&D IN BRACE POST     N.E.  72.53'

 

2018

FOUND BOLT ON SIGN POST N 48.67’

NE COR ELEC BOX SW 67.31’

SET NIAL IN CMP SE 51.23’

5-104-41

W 1/4

STONE IN 1894 (SET),

STONE IN 1978 (PLACED IRON PIN)

N&D IN COR POST (RT)     E.  33.75'
PAINTED STL POST (LT)     W.  33.05'

5-104-41

SW

STONE IN 1895,

IRON PIN IN 1978,

PLACED IRON PIN IN 1980

 

2018 FOUND REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

1980
N&D IN PP     S.W.  46.91'
PUNCH HOLE IN CMP     S.E.  35.50'
BOTTOM BOLT IN YIELD SIGN POST     N.W.  48.13'

 

2018

FOUND BOLT ON SIGN POST NW 38.59’

FOUND PUNCH HOLE IN CMP SE 35.50’

FOUND NAIL AND DISC IN PP SW 46.91’

5-104-41

S 1/4

FOUND IRON PIPE 6" DOWN IN 1977,

PLACED 5/8" X 24" IRON PIN IN 1980

 

2018 FOUND 5/8” REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

1980
N&D IN FE POST     N.  104.19'
PUNCH HOLE ON W. END CMP IN FE ENT     N.  29.40'
PUNCHHOLE ON E. END CMP IN FE ENT     N.  41.39'

 

2018

FOUND NAIL AND BC IN POST N 104.62’

FOUND HOLE IN CMP NNW 29.47’

FOUND HOLE IN CMP NE 49.36’

5-104-41

CENTER

STONE IN 1895

NONE

6-104-41

N 1/4

STONE IN 1895 (SET),

IRON PIN IN 1950 (PLACED WOOD STAKE),

STAKE IN 1960,

IRON PIN IN 1980,

PLACED 1 3/4" PK NAIL IN 1994 (AFTER OVERLAY)

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1994
N&D IN BRACE FE POST     N.W.  61.68'
N&D IN COR FE POST     N.W.  57.97'
N&D IN PP     S.W.  57.59'

 

N=227024.190’   E=538900.660’

6-104-41

NW

STONE IN 1894,

STONE IN 1916,

STONE IN 1923,

STONE IN 1950,

STONE IN 1960 (PLACED WOOD STAKE),

IRON PIN IN 1980

1980
HUB     N.E.  38.70'
HUB     N.W.  37.65'
BOTTOM BOLT ON SIGN POST     E.  32.50'

6-104-41

W 1/4

STONE IN 1894 (SET),

STONE IN 1923,

STONE IN 1950,

STONE IN 1960 (PLACED WOOD STAKE),

IRON PIN IN 1980,

PLACED 1 3/4" PK NAIL IN 1994 (AFTER OVERLAY)

 

2018 FOUND PK NAIL – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1994
N&D IN FE POST     W.  51.96'
N&D IN PP     N.W.  69.00'
N&D IN COR FE POST     E.  50.93'

 

2018

FOUND NAIL AND DISC IN POST E 50.93’

SET 3/8” REBAR NW 37.89’

SET 3/8” REBAR SW 32.01’

 

N=224311.233’   E=536396.277’

6-104-41

SW

STONE IN 1894,

STONE IN 1923,

IRON PIN IN 1950,

IRON PIN IN 1960,

IRON PIN IN 1980,

RAISED IRON PIN IN 1993,

PLACED 1 3/4" PK NAIL IN 1994 (AFTER OVERLAY), COR IS 12.6' EAST OF CL OF ROAD

2006 – LOCATED REBAR AT THE INTERSECTION – ULTEIG ENGINEERING INC

CORNER CERTIFICATE

 

2018 FOUND REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1994
N&D IN BRACE POLE     S.W.  68.73'
N&D IN PP     N.E.  67.90'
N&D IN PP     S.E.  49.78'

2006 – ULTEIG ENGINEERING INC.

“X” ON TOP OF TEL-PED N.E.   53.5’

MINIMUM MAINTENCE SIGN N.E.   36.5’

STREET SIGN POST  S.E   40.3’

NOBLES COUNTY COORDINATES  N = 221724..89  E = 531034.69

 

2018

SET MAG IN CMP NW 50.17’

NW COR OF ELEC BOX SE 51.47’

FOUND NAIL AND DISC IN POLE SW 68.48’

 

N=221664.338’   E=536379.104’

6-104-41

S 1/4

STONE IN 1894 (SET),

STONE IN 1932,

FOUND STONE / "X" 6" DOWN IN 1977,

PLACED 5/8" X 24" IRON PIN IN 1980

 

2018 FOUND 5/8” REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

1980
PUNCH HOLE IN W. END CMP IN FE ENT     N.  37.24'
PUNCH HOLE IN E. END CMP IN FE ENT     N.  39.07'
PUNCH HOLE IN W. END CMP IN FE ENT     S.  25.86'
PUNCH HOLE IN E. END CMP IN FE ENT     S.  44.85'

 

2018

FOUND NAIL AND DISC IN CMP NW 37.24’

FOUND NAIL AND DISC IN CMP NE 39.07’

FOUND NAIL AND DISC IN CMP SE 44.88’

6-104-41

CENTER

STONE IN 1894 (SET)

NONE

7-104-41

W 1/4

STAKE IN 1950,

STAKE IN 1960,

IRON PIN IN 1980,

RASIED IRON PIN IN 1993,

PLACED 1 3/4" PK NAIL IN 1994 (AFTER OVERLAY), 

FOUND PK NAIL & DETECTED METAL UNDER PK ON SEPT. 23, 1998 – MADSEN LAND SURVEYING

 

2018 FOUND 5/8” REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1994
N&D IN PP     S.E.  59.32'
TOP OF STL FE POST     S.W.  57.77'
N&D IN BRACE POST (UPPER DISC)     N.W.  49.88'

 

1998 (MADSEN LAND SURVEYING)

DISC IN PP     S.E.  59.31’

DISC IN COR POST     W.  50.21’

DISC IN BRACE POST     W.N.W  49.91’

 

2018

FOUND NAIL AND DISC IN POST W 50.21’

SET 3/8” REBAR NE 39.40’

NW COR ELEC BOX SE 56.67’

 

N=219010.571’   E=536332.630’

7-104-41

SW

STAKE IN 1896,

IRON PIN IN 1923,

STAKE IN 1950,

STAKE IN 1960 (PLACED IRON PIN),

IRON PIN IN 1980,

RAISED IRON PIN IN 1993,

PLACED 1 3/4" PK NAIL IN 1994 (AFTER OVERLAY), 

FOUND PK & DETECTED METAL UNDER PK NAIL ON SEPT. 23, 1998 – MADSEN LAND SURVEYING

 

2018 FOUND REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1994
TOP UGTCM     N.W.  74.12'
N&D IN PP     N.E.  46.22'
N&D IN PP BRACE POLE     N.E.  79.20'
TRUE COR IS APPROX 17' EAST OF CL CSAH 13

 

1998 (MADSEN LAND SURVEYING)

DISC IN PP     N.E.  46.22’

DISC IN BRACE POLE     N.E.  79.20’

CL TEL PED     N.W.  74.10’

CL HWY     W.  15.0’

 

2018

CENTER OF TELE PED NW 74.10’

SW COR OF ELEC BOX NE 52.61’

FOUND NAIL AND DISC IN PP NEE 78.73’

 

N=216363.173’   E=536298.941’

7-104-41

S 1/4

STONE IN 1896 (SET),

STONE IN 1937

 

2018 FOUND 1/2” REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SET NAIL IN TELE POST N 32.32’

SET 3/8” REBAR SW 54.94’

SET 3/8” REBAR SE 54.22’

7-104-41

CENTER

NONE

NONE

8-104-41

W 1/4

STAKE IN 1896

 

2018 FOUND REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

FOUND NAIL AND DISC IN PP NW 51.05’

SET 3/8” REBAR NE 36.89’

SET 3/8” REBAR SE 53.44’

8-104-41

SW

STAKE IN 1896,

STONE IN 1937,

STONE IN 1939 (PLACED WOOD STAKE)

 

2018 FOUND REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SET MAG IN CMP NW 34.58’

SET MAG IN CMP NE 33.51’

SET MAG IN PP SW 44.25’

8-104-41

S 1/4

STONE IN 1896

NONE

8-104-41

CENTER

NONE

NONE

9-104-41

W 1/4

NONE

NONE

9-104-41

SW

STAKE IN 1939

 

2018 FOUND 1” CAPPED PIPE – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

FOUND REBAR S 33.22’

SET 3/8” REBAR NW 31.00’

SIGN POST NE 40.08’

9-104-41

S 1/4

NONE

 

2018 FOUND 1” CAPPED PIPE – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

FOUND NAIL AND DISC IN COR POST N 34.68’

SET 3/8” REBAR SW 47.89’

SET 3/8” REBAR SE 39.21’

9-104-41

CENTER

NONE

NONE

10-104-41

W 1/4

NONE

 

2018 SET 5/8” CAPPED REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

CENTER OF SIGN POST NNW 86.07’

CENTER OF DRAIN TILE NW 107.37’

SET PK IN PP SW 69.36’

10-104-41

SW

STONE IN 1937

 

2018 FOUND REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SET MAG IN PP NW 44.69’

NW COR OF ELEC BOX SE 53.08’

NE COR OF ELEC BOX SW 49.24’

10-104-41

S 1/4

NONE

 

2018 SET 5/8” CAPPED REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

T-POST S 101.91’

T-POST NE 219.49’

SET PK NAIL IN PP NNE 38.91’

10-104-41

CENTER

NONE

NONE

11-104-41

W 1/4

NONE

 

2018 FOUND REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SET 3/8” REBAR NW 48.17’

SET PK IN TELE POST E 30.19’

SET 3/8” REBAR SW 48.24’

11-104-41

SW

STAKE IN 1937

 

2018 FOUND REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SET 3/8” REBAR NW 33.02’

SET MAG NAIL IN PP NE 49.09’

SET MAG NAIL IN PP SE 100.60’

11-104-41

S 1/4

NONE

 

2018 SET 5/8” CAPPED REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SET 3/8” REBAR N 36.08’

SET PK NAIL IN PP SE 114.36’

SET PK NAIL IN PP SW 160.17’

11-104-41

CENTER

NONE

NONE

12-104-41

W 1/4

STONE IN 1928,

STAKE IN 1962,

IRON PIPE 1970

 

2018 FOUND REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1970
N&D IN PP     E.  49.53'
N&D IN PP     W.S.W.  49.32'

 

2018

SET 3/8” REBAR NW 53.48’

FOUND NAIL AND DISC IN PP SE 49.53’

SET MAG IN TELE POST SW 184.96’

 

N=219279.649’   E=562686.775’

12-104-41

SW

STAKE IN 1962 (PLACED IRON PIN),

IRON PIPE IN 1970,

PLACED 3/4" X 18" REBAR IN 1991,

PLACED 3/4" X 18" REBAR IN 1993

 

2018 FOUND REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1970
NAIL DOWN CL TWP RD     E.
  104.60'
NAIL DOWN CL TWP RD     E.  208.68'
NAIL DOWN CL TWP RD     W.  101.90'
NAIL DOWN CL TWP RD     W.  205.14'
N&D IN PP     N.E.  76.46'

 

2018

SET MAG IN PP SE 131.10’
SET MAG IN TELE POST SSW 107.66’
SET MAG IN PP SWW 136.97’

 

N=216627.044’   E=562704.386’

12-104-41

S 1/4

STONE IN 1899,

STONE IN 1935

NONE

12-104-41

SE

STONE IN 1898,

STONE IN 1937

NONE

12-104-41

E 1/4

STONE IN 1898,

STONE IN 1937

NONE

12-104-41

CENTER

NONE

NONE

13-104-41

W 1/4

STONE IN 1903,

STONE IN 1928,

STAKE IN 1962,

IRON PIPE IN 1970,

PLACED 3/4" X 18" REBAR IN 1991

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1970
N&D IN COR FE POST     W.  50.68'
NAIL IN FE ENT CULV     W.  42.08'
NAIL IN FE POST     E.  77.06'

 

N=213974.337’   E=562713.150’

13-104-41

SW

STONE IN 1903,

STONE IN 1925,

STONE IN 1928,

STONE IN 1953,

STONE IN 1962 (PLACED WOOD STAKE),

WOOD STAKE IN 1966,

IRON PIN IN 1980,

IRON PIN IN 1981,

IRON PIN IN 1982

PLACED PK NAIL AFTER OVERLAY, 2017

1982
N&D IN PP     S.E.  112.10'
N&D IN FE POST     S.W.  102.20'
TOP OF UGTCM     N.W.  120.80'

2017 NOBLES COUNTY COORDINATES     N=211334.60       E=562717.06

13-104-41

S 1/4

STONE IN 1899,

STONE IN 1925,

1X2 HUB IN 1966 (ASSUMED),

IRON PIN IN 1981,

PLACED 1 3/4" PK NAIL IN 1994 (AFTER OVERLAY)

PLACED PK NAIL AFTER OVERLAY, 2017

1994
TOP STL FE POST     N.W.  69.54'
TOP STL FE POST     N.  50.80'
N&D IN FE POST     S.  51.15'

2017 NOBLES COUNTY COORDINATES     N=211353.51         E=565373.40

13-104-41

SE

STONE IN 1899,

STONE IN 1925,

STONE IN 1935 (PLACED WOOD STAKE),

STAKE IN 1955,

STONE WITH WOOD STAKE IN 1966 (PLACED WOOD STAKE)

1966
N&D IN TP     N.E.  45.05'
N&D IN PP     S.E.  71.65'
N&D IN TP     N.W.  44.65'
N&D IN PP     S.W.  72.50'

13-104-41

E 1/4

STONE IN 1899,

STONE IN 1901

NONE

13-104-41

CENTER

STONE IN 1899

NONE

14-104-41

W 1/4

NONE

NONE

14-104-41

SW

STONE IN 1928,

STONE IN 1954 (PLACED WOOD STAKE),

TRACE OF STAKE & SMALL STONE IN 1982 (ASSUMED CORRECT)

PLACED 1 3/4" PK NAIL IN 1994 (AFTER OVERLAY)

 

2018 FOUND REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1994
N&BC IN COR FE POST     N.E.  59.83'
N&BC IN PP     S.E.  68.15'
N&BC IN 1st POST WEST OF COR FE POST     S.W.  66.36'

 

2018

FOUND X IN CMP NW 37.04’
FOUND NAIL AND BC IN POST NE 59.82’
FOUND NAIL AND BC IN POST SW 66.36’

 

N=211298.405’   E=557431.904’

14-104-41

S 1/4

STONE IN 1928,

STONE IN 1954 (PLACED WOOD STAKE),

STONE & WOOD STAKE IN 1982 (PLACED IRON PIN)

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1982
N&D TOP OF COR FE POST     S.  51.37'
N&D IN COR FE POST     N.  51.91'
2nd STL FE POST W. OF COR FE POST     S.W.  57.70'

 

N=211316.989’   E=560073.798’

14-104-41

CENTER

NONE

NONE

15-104-41

W 1/4

NONE

 

2018 SET 5/8” CAPPED REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

TOP OF CULVERT NE 25.00’
TOP OF CULVERT SE 22.03’
SW COR 15-104-41 S 2624.62’

15-104-41

SW

STONE IN 1928,

STONE IN 1935,

STONE IN 1954 (PLACED WOOD STAKE),

STONE & WOOD STAKE IN 1982 (PLACED IRON PIN), 

FOUND ½” ROD (1/2” DEEP) IN BIT PAVING IN 1993 (MADSEN SURVEYING),  

FOUND IRON PIN IN 1993, 

PLACED 1 3/4" PK NAIL IN 1994 (AFTER OVERLAY)

 

2018 FOUND REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1993 (MADSEN SURVEYING)

STOP SIGN POST     N.W.  55.00’

CL  TEL PED     N.E.  60.10’

UNDERGROUND POWER CABLE SIGN     S.E.  58.20’

 

1994
TOP OF TEL PED     N.E.  60.16'
NW COR OF ELEC BOX     S.E.  63.50'
BOTTOM BOLT STOP SIGN POST     N.W.  54.90'
NEAR EDGE STL FE POST     S.W.  81.00'

 

2018

FOUND BOLT IN SIGN POST NW 55.57’
CENTER OF TELE PED NE 60.16’
NE COR OF ELEC BOX SW 83.20’

 

N=211249.591’   E=552129.913’

15-104-41

S 1/4

FOUND 2X2 HUB IN 1982 (PLACE IRON PIN),

FOUND IRON PIN IN 1993,

PLACED 1 3/4" PK NAIL IN 1994 (AFTER OVERLAY)

 

2018 FOUND PK NAIL – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1994
60 COMMON NAILS IN SHLD     N.E.  34.84'
60 COMMON NAILS IN SHLD     N.W.  27.48'
60 COMMON NAILS IN SHLD     S.W.  58.12'

 

2018

FOUND 60D NAILS IN SHLD     NE  34.84'
FOUND 60D NAILS IN SHLD     NW  27.48'
FOUND 60D NAILS IN SHLD     SW  58.12'

 

N=211274.251’   E=554775.779’

15-104-41

CENTER

NONE

NONE

16-104-41

W 1/4

NONE

NONE

16-104-41

SW

IRON PIN IN 1895,

STONE IN 1928,

STAKE IN 1954 (REESTABLISHED),

STAKE IN 1982 (PLACED IRON PIN),

FOUND IRON PIN IN 1993,

PLACED 1 3/4" PK NAIL IN 1994 (AFTER OVERLAY)

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1994
N&BC IN FE POST     S.W.  61.80'
1/2" IRON PIN IN CL (NORTH-SOUTH TWP RD)     S.  100.00'
N&D IN FE POST     S.E.  69.25'
N&D IN FE POST     N.E.  56.50'

 

N=211240.805’   E=546851.157’

16-104-41

S 1/4

STONE IN 1928,

STONE IN 1935,

STAKE IN 1954,

STAKE IN 1982 (PLACED IRON PIN),

FOUND ½” ROD (1/2” DEEP) IN BIT PAVING IN 1993 (MADSEN SURVEYING),  

FOUND IRON PIN IN 1993,

PLACED 1 3/4" PK NAIL IN 1994 (AFTER OVERLAY)

 

2018 FOUND PK NAIL – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1993 (MADSEN SURVEYING)

R/W POST     S.  49.55’

(S. FE LINE IS 1’ WEST OF COR)

 

1994

60 COMMON NAIL IN SHLD     N.E.  35.23'
60 COMMON NAIL IN SHLD     N.W.  44.40'
60 COMMON NAIL IN SHLD     S.W.  29.32'

 

2018

SET 3/8” REBAR SE 39.09’

SET PK NAIL IN CULVERT NE 47.28’

SET PK NAIL IN CULVERT NW 48.58’

 

N=211261.246’   E=549489.901’

16-104-41

CENTER

NONE

NONE

17-104-41

W 1/4

STAKE IN 1896

NONE

17-104-41

SW

IRON PIN IN 1895,

IRON PIN IN 1928,

IRON PIN IN 1937,

IRON PIN IN 1954 (PLACED WOOD STAKE),

IRON PIN & STAKE IN 1982,

FOUND IRON PIN IN 1993,

PLACED 1 3/4" PK NAIL IN 1994 (AFTER OVERLAY)

 

FD PK NAIL (2011)

 

2018 FOUND PK NAIL – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1994
N&BC IN PP     S.W.  60.06'
TOP OF TEL PED     N.E.  60.82'
BOTTOM BOLT IN STOP SIGN POST     S.E.  48.88'

 

2018

FOUND NAIL AND BC IN PP SW 60.06’
FOUND BOLT ON SIGN POST SE 48.88’
SW COR TELE PED NE 60.22’

 

N=211125.014’   E=541542.897’

17-104-41

S 1/4

IRON PIN IN 1895,

IRON PIN IN 1928,

TRACE 2X2 HUB IN 1982 - PLACED IRON PIN (ASSUMED CORRECT),

FOUND IRON PIN IN 1993,

PLACED 1 3/4" PK NAIL IN 1994 (AFTER OVERLAY)

 

FD PK NAIL (2011)

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1994
N&D IN PP     N.W.  98.30'
TOP OF TEL PED     N.W.  56.90'
N&D IN PP     N.E.  71.58'

 

N=211187.355’   E=544213.116’

17-104-41

CENTER

NONE

NONE

18-104-41

W 1/4

IRON PIN IN 1950,

IRON PIN IN 1960,

IRON PIN IN 1980

 

2018 FOUND REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1980
N&D IN FE POST     N.E.  39.46'
N&D IN COR FE POST     E.  33.17'
N&D IN PP     S.E.  97.23'
(TRUE CORNER IS 3.4' EAST OF MAT)

 

2018

SET 3/8” REBAR NW 51.84’
FOUND NAIL AND DISC IN POST E 32.67’
SET 3/8” REBAR SW 47.01’

 

N=213706.370’   E=536315.388’

18-104-41

SW

STONE IN 1900,

IRON PIN IN 1937,

IRON PIN IN 1950,

IRON PIN 1960,

IRON PIN IN 1982,

RAISED IRON PIN IN 1993,

PLACED 1 3/4" PK NAIL IN 1994 (AFTER OVERLAY)

 

2018 FOUND PK NAIL – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1994
N&D IN PP     S.E.  70.10'
TOP OF TEL PED     N.W.  144.80'
BOTTOM BOLT STOP SIGN     S.W.  56.58'
BOTTOM BOLT STOP SIGN     N.E.  54.17'

 

2018

FOUND X ON RCP SW 47.02’
FOUND X ON RCP NW  48.68’
NW COR ELEC BOX SE 73.10’

 

N=211061.571’   E=536347.380’

18-104-41

S 1/4

STAKE IN 1928,

STAKE IN 1954,

FOUND NOTHING IN 1982 (PLACED ASSUMED CORNER),

FOUND ASSUMED COR IN 1993 (PLACED 1 3/4" PK NAIL OVER ASSUMED COR (AFTER OVERLAY)

 

2018 FOUND PK NAIL – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1994
N&BC IN COR FE POST     N.  49.25'
N&BC IN COR FE POST     S.  53.05'
N&BC IN PP     S.W.  58.25'

 

2018

FOUND NAIL AND CAP IN POST  N  49.25’
FOUND X ON RCP NE  28.79’
FOUND NAIL AND CAP IN POST  S 53.05'

 

N=211071.422’   E=538883.595’

18-104-41

CENTER

NONE

NONE

19-104-41

W 1/4

STONE IN 1900,

STONE IN 1923,

IRON PIN IN 1950,

COULD NOT FIND IN 1980,

FOUND RR SPK BELOW PAVEMENT 6' RT OF CL & LEFT AS FOUND IN 1993

 

FD IRON PIN (2011)

 

2018 SET CAPPED REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

NONE

 

2018

SET PK IN POST NWW 52.33’
SET PK IN PP NE 106.80’
SET 3/8” REBAR E 50.87’

 

N=208406.380’   E=536342.750’

19-104-41

SW

STONE IN 1900,

STONE IN 1923,

STONE IN 1950 (PLACED WOOD STAKE),

IRON PIN IN 1980,

PLACED 1 3/4" PK NAIL IN 1994 (AFTER OVERLAY)

 

2018 FOUND RR SPIKE – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1994
N&D IN PP     N.E.  106.35'
N&D IN PP     S.E.  101.10'
TOP OF UGTCM     S.E.  65.13'

 

2018

FOUND NAIL AND CAP IN PP  NE  106.35’
NW COR ELEC BOX SE 54.07’
TOP TELE PED SSE 65.14’

 

N=205759.809’   E=536343.018’

19-104-41

S 1/4

NONE

 

2018 SET CAPPED REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SET 3/8” REBAR SW 28.36’
SET 3/8” REBAR SE 71.26’

19-104-41

CENTER

NONE

NONE

20-104-41

W 1/4

IRON PIN IN 1895

 

2018 FOUND IRON PIPE – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SET 3/8” REBAR NW 23.13’
SET 3/8” REBAR NE 17.78’

SET 3/8” REBAR SE 30.47’

20-104-41

SW

IRON PIN IN 1895,

STONE IN 1935 (PLACED WOOD STAKE)

 

FD ½” IRON PIN (2011)

 

2018 SET CAPPED REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

CENTER OF TELE PED NE 46.17’
SIGN POST SE 41.07’

NE COR OF ELEC BOX 62.53’

20-104-41

S 1/4

IRON PIN IN 1895

 

2018 FOUND 2” IRON PIPE – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SET 3/8” REBAR NW 33.02’
SET 3/8” REBAR NE 22.25’

SET 3/8” REBAR SW 35.68’

20-104-41

CENTER

STONE IN 1895 (SET)

 

CALCULATED POSITION

NO CORNER CERTIFICATE

NONE

21-104-41

W 1/4

IRON PIN IN 1895

 

FD IRON PIN (2011)

 

2018 FOUND IRON PIPE – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SET PK IN CMP NW 37.00’
SET 3/8” REBAR E 11.68’

SET PK IN CMP SW 29.79’

21-104-41

SW

STONE IN 1895 (SET),

STONE IN 1900,

STONE IN 1936 (PLACED WOOD STAKE),

STAKE IN 1937

 

2018 FOUND 1/2” PIPE – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

NE COR ELEC BOX SW 55.25’
SET X IN RCP NE 30.69’

SET X IN RCP SE 26.86’

21-104-41

S 1/4

STONE IN 1900,

STAKE IN 1936

 

2018 SET CAPPED REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SET 3/8” REBAR NW 110.11’
SET 3/8” REBAR NE 27.04’

SET 3/8” REBAR S 10.94’

21-104-41

CENTER

NONE

NONE

22-104-41

W 1/4

DUG WITH A BACKHOE IN THE VICINITY OF CORNER & FOUND NOTHING, SET Ύ” O.D. X 24” I.P. @ OBLITERATED LOCATION. CORNER IS IN CL N-S TOWNSHIP ROAD IN LINE WITH FE WEST.  (1993 MADSEN SURVEYING)

 

2018 FOUND IRON PIPE – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

1993

BC IN FE POST     W.  74.45’

 

2018

SET PK IN PP NW 151.15’
SET 3/8” REBAR E 25.11’

SET PK IN PP SW 123.11’

22-104-41

SW

STONE IN 1900,

STAKE IN 1936, 

DUG A 10’ X 10’ X 4’ HOLE WITH A BACKHOE & FOUND NOTHING IN 1993 (MADSEN SURVEYING)

 

2018 SET CAPPED REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

CENTER OF SIGN NW 37.68’
T-POST NE 80.91’

CENTER OF SIGN SE 37.74’

22-104-41

S 1/4

STAKE IN 1936

NONE

22-104-41

CENTER

NONE

NONE

23-104-41

W 1/4

NONE

NONE

23-104-41

SW

STONE IN 1936

 

2018 SET CAPPED REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

CENTER OF TELE PED NW 60.36’
SIGN POST SE 57.38’

CENTER OF TELE PED SW 61.05’

23-104-41

S 1/4

NONE

 

2018 SET CAPPED REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SET 3/8” REBAR NW 40.67’
SET 3/8” REBAR NE 33.77’

SET PK NAIL IN POST SW 34.42’

23-104-41

CENTER

NONE

NONE

24-104-41

W 1/4

STONE IN 1923,

STAKE IN 1953,

STAKE IN 1961,

STAKE IN 1980 (PLACED IRON PIN),

IRON PIN IN 1992,

PLACED 1 3/4" PK NAIL IN 1992 (AFTER OVERLAY)

PLACED PK NAIL AFTER OVERLAY, 2017

1992
FACE STL FE POST     E.  50.97'
N&D IN BR POST     S.W.  51.40'
N&D IN FE POST     N.W.  67.38'

2017 NOBLES COUNTY COORDINATES     N=208693.94       E=562699.54

24-104-41

SW

STAKE IN 1923,

STAKE IN 1953,

STAKE IN 1961,

COULD NOT FIND IN 1980,

STAKE IN 1992 (IRON PIN),

PLACED 1 3/4" PK NAIL IN 1992 (AFTER OVERLAY)

PLACED PK NAIL AFTER OVERLAY, 2017

1992
N&D IN PP     S.E.  58.97'
N&D IN COR FE POST     N.W.  60.64'
N&D IN PP     N.E.  63.95'

2017 NOBLES COUNTY COORDINATES     N=206053.34       E=562682.59

24-104-41

S 1/4

NONE

NONE

24-104-41

SE

STONE IN 1936, 

FOUND LARGE STONE (21” DEEP) WITH WOOD HUB OVER STONE. – SET IRON ROD ON EAST SIDE OF STONE & Ύ” X 18” IRON PIN OVER STONE (3” DEEP) ON MAY 8, 2001 – MADSEN LAND SURVEYING

2001 (MADSEN LAND SURVEYING)

STREET SIGN POST     S.E.  40.67’

BC IN PP     N.W.  42.56’

SIGN POST     N.E.  53.83’

24-104-41

E 1/4

NONE

NONE

24-104-41

CENTER

NONE

NONE

25-104-41

W 1/4

STAKE IN 1923,

STAKE IN 1953,

STAKE IN 1961,

STAKE IN 1980 (PLACED IRON PIN),

IRON PIN IN 1992

PLACED PK NAIL AFTER OVERLAY, 2017

1980
N&D IN BR POST     S.W.  50.33'
N&D IN GATE POST     N.E.  55.74'
N&D IN COR POST     W.  50.50'

2017 NOBLES COUNTY COORDINATES     N=203389.51       E=562670.35

25-104-41

SW

STONE IN 1919,

STONE IN 1935,

STAKE IN 1953,

STAKE IN 1961,

COULD NOT FIND IN 1980,

STAKE IN 1992 (PLACED IRON PIN),

PLACED 1 3/4" PK NAIL IN 1992 AFTER OVERLAY (CORNER IS APPROX 8' WEST OF CL)

PLACED PK NAIL AFTER OVERLAY, 2017

 

2018 FOUND PK NAIL – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

1992
N&D IN COR FE POST     E.  58.93'
"X" ON TOP OF CL CULV     S.E.  44.72'
N&D IN COR FE POST     S.W.  54.66'

2017 NOBLES COUNTY COORDINATES     N=200757.76       E=562653.16

 

2018

SET PK IN CMP NW 44.18’

SET PK IN CMP SW 48.31’

FOUND X IN RCP SE 44.72’

25-104-41

S 1/4

NONE

NONE

25-104-41

SE

STONE IN 1919 (SET), 

FOUND A 5/8” ROD (14” DEEP) & SET A Ύ” O.D.   I.P. ALONG SIDE OF 5/8” ROD WITH TOP OVER ROD (4” DEEP) IN 1992 (MADSEN SURVEYING)

1992 (MADSEN SURVEYING)

R/W POST     N.E.  55.70’

BC IN PP     S.E.  54.55’

R/W POST     N.W.  60.10’

BC IN TEL PED POST     N.W.  71.30’

BC IN PP     S.W.  97.80’

25-104-41

E 1/4

STONE IN 1937

NONE

25-104-41

CENTER

NONE

NONE

26-104-41

W 1/4

NONE

NONE

26-104-41

SW

STONE IN 1936,

STONE IN 1978 (PLACED IRON PIN)

 

2018 FOUND 5/8” REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

1978
N&D IN PP     N.W.  54.42'
N&D IN PP     S.E.  34.15'
N&D IN PP     S.W.  46.95'

 

2018

FOUND NAIL AND BC IN PP NW 54.42’

SET PK IN COR POST SE 48.16’

FOUND NAIL AND BC IN PP SW 46.95’

26-104-41

S 1/4

NONE

 

2018 FOUND 3/8” REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SET 3/8” REBAR NW 27.65’

SET 3/8” REBAR NE 19.65’

SET PK NAIL IN POST S 33.60’

26-104-41

CENTER

NONE

NONE

27-104-41

W 1/4

STONE IN 1900

 

2018 SET CAPPED REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SET PK IN POST NW 53.27’

SET 3/8” REBAR NE 33.02’

CENTER OF STEEL POST W 33.63’

27-104-41

SW

STONE IN 1900

 

2018 SET CAPPED REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SET PK IN TELE POST NW 43.33’

SW COR OF ELEC BOX NE 47.57’

SET PK IN PP SE 44.33’

27-104-41

S 1/4

NONE

 

2018 FOUND CAPPED IRON PIPE – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SET PK IN CMP NW 47.72’

SET PK IN CMP NE 35.58’

FOUND NAIL IN POST S 37.34’

27-104-41

CENTER

NONE

NONE

28-104-41

W 1/4

STONE IN 1900

 

2018 SET CAPPED REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

T-POST NW 84.70’

CENTER OF DRAIN TILE SE 60.33’

SET 3/8” REBAR W 31.17’

28-104-41

SW

STONE IN 1900,

STONE IN 1937

 

2018 SET CAPPED REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SW COR OF ELEC BOX NE 51.04’

SIGN POST SE 39.51’

CENTER OF GATE VALVE SW 61.11’

28-104-41

S 1/4

NONE

 

2018 SET CAPPED REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SET TOP OF CULVERT NW 19.53’

SET TOP OF CULVERT SW 19.00’

SET METAL COR POST S 30.70’

28-104-41

CENTER

STONE IN 1900

NONE

29-104-41

W 1/4

NONE

 

2018 SET CAPPED REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SET TOP OF CULVERT NW 36.25’

SET TOP OF CULVERT SW 36.40’

SET PK IN PP SE 31.96’

29-104-41

SW

STONE IN 1937,

COULD NOT FIND IN 1980

 

2018 SET CAPPED REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

CENTER OF TELE PED NW 45.09’

SIGN POST SE 35.08’

SET PK IN COR POST SW 47.25’

29-104-41

S 1/4

STONE IN 1900,

STONE IN 1937

 

2018 SET CAPPED REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SET PK IN PP NE 43.50’

SET CENTER OF 4” POST SSE 34.53’

SET 3/8” REBAR SW 34.71’

29-104-41

CENTER

NONE

NONE

30-104-41

W 1/4

STAKE IN 1950,

COULD NOT FIND 1980

 

2018 SET CAPPED REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

NONE

 

2018

T-POST W 111.97’

SIGN POST NW 152.01’

SET 3/8” REBAR E 48.77’

 

N=203124.000’   E=536341.450’

30-104-41

SW

STONE IN 1900 (SET),

STONE IN 1923,

STONE IN 1938,

STONE IN 1950 (PLACED WOOD STAKE),

IRON PIN IN 1980,

RAISED IRON PIN IN 1993,

PLACED 1 3/4" PK NAIL IN 1994 (AFTER OVERLAY)

 

2018 FOUND REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1994
N&D IN PP     S.W.  71.94'
N&D IN PP     N.W.  72.79'
N&D IN COR FE POST     N.E.  67.12'

 

2018

SET PK IN PP NW 151.26’

SE COR TELE PED NNW 71.84’

SET PK IN PP NE 62.79’

 

N=200468.923’   E=536370.576’

30-104-41

S 1/4

FOUND 3/4" X 48" IRON PIN IN 1980

 

2018 FOUND IRON PIPE – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

1980
N&D IN COR FE POST     S.  33.30'
N&D IN PP     S.E.  71.95'
"X" ON N.E. COR BRIDGE     W.  63.65'
"X" ON S.E. COR BRIDGE     W.  70.25'

 

2018

SET PK IN PP NW 91.55’

SET 3/8” REBAR NE 35.33’

SET 3/8” REBAR SSE 25.02’

30-104-41

CENTER

NONE

NONE

31-104-41

W 1/4

STONE IN 1900,

STONE IN 1911,

STONE IN 1923,

IRON PIN IN 1950 (PLACED WOOD STAKE),

STAKE IN 1961,

IRON PIN IN 1980,

RAISED IRON PIN IN 1993,

PLACED 1 3/4" PK NAIL IN 1994 (AFTER OVERLAY)

 

2018 FOUND REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1994
N&D IN PP     S.W.  71.75'
SPK IN COR FE POST     W.  50.94'
TOP 2nd STL FE POST     N.W.  70.35'

 

2018

FOUND NAIL IN COR POST W 50.58’

SET PK IN CULVERT E 36.04’

SET PK IN CULVERT SE 44.78’

 

N=197816.457’   E=536369.566’

31-104-41

SW

STONE IN 1900,

STONE IN 1911,

STONE IN 1923,

STONE IN 1944,

STONE IN 1951 (PLACED WOOD STAKE),

STAKE IN 1961,

IRON PIN IN 1980 (25' SOUTH OF CL OF TH 266)

2006 – LOCATED ½” REBAR 1.4’ DEEP IN GRAVEL ROADWAY. - ULTEIG ENGINEERS INC.

CORNER CERTIFICATE

1980
N&D IN PP     N.W.  111.98'
N&D IN PP     S.W.  70.00'
N&D IN PINE TREE     S.E.  96.37'

2006 – ULTEIG ENGINEERS INC.

TOP CENTER OF TEL-PED  S.W.   66.2’

“X” NAILED ON POWER POLE  S.W.   70.2’

STOP SIGN POLE  S.E.  31.9’

NOBLES COUNTY COORDINATES

N = 195170.17

E = 536314.60

31-104-41

S 1/4

STONE IN 1900,

IRON PIN IN 1944

2006 – LOCATED ½” REBAR on shoulder of road IN LINE WITH FENCE SOUTH. – ULTEIG ENGINEERS INC.

CORNER CERTIFICATE

NONE

2006 – ULTEIG ENGINEERS INC.

“X” NAILED ON POWER POLE  S.W.   85.1’

“X” NAILED ON WOOD FENCE POST  S.   61.6’

“X” NAILED ON POWER POLE  S.E.   135.6’

NOBLES COUNTY COORDINATES

N = 195215.10

E = 538831.80

31-104-41

CENTER

NONE

NONE

32-104-41

W 1/4

NONE

 

2018 SET CAPPED REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

T-POST W 91.62’

SET PK IN PP NE 78.81’

SET 3/8” REBAR SE 76.00’

32-104-41

SW

STONE IN 1944,

STONE IN 1952,

STONE IN 1960 (PLACED IRON PIN),

IRON PIN IN 1980

2006 – Ύ” REBAR, NE OF TH 266 AND WEST OF C.S.A.H. 16

CORNER CERTIFICATE

1980
N&D IN COR FE POST     N.W.  57.23'
N&D IN COR FE POST     N.E.  59.59'
N&D IN PP     S.E.  63.12'

2006 – ULTEIG ENGINEERS INC.

“X” CHISELED INTO WEST END OF C.M.P.  S.E.    36.8’

“X” NAILED IN POWER POLE  S.E.   63’

S.E. CORNER OF AMISH CEMETARY  SIGN  NW   106.6’

NOBLES COUNTY COORDINATES

N = 195210.78

E = 541471.98

32-104-41

S 1/4

PLACED 11" BRIDGE PIN IN 1990,

PLACED STL PIN IN 1991 (AFTER GRADING)

2006 – LOCATED 5/8” REBAR IN ASPHALT ROADWAY. - ALTEIG ENGINEERS INC.

CORNER CERTIFICATE

 

PLACED PK NAIL AFTER OVERLAY, 2017

 

2018 FOUND PK NAIL – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

1991
N&D IN PP     S.E.  58.97'
"X" IN CS CULV     N.E.  51.78'
"X" IN CS CULV     N.W.  44.72'

2006 – ULTEIG ENGINEERS INC.

PK NAIL IN WOOD POWER POLE  S.E.   58.9’

PK NAIL TOP OF WOOD FENCE POST  S.   51’

NOBLES COUNTY COORDINATES  N = 195228.38  E = 544115.98

2017 NOBLES COUNTY COORDINATES     N=195228.31       E=544115.93

 

2018

SET PK IN PP SW 126.26’

SET PK IN PP SE 159.42’

FOUND PK IN COR POST S 51.00’

32-104-41

CENTER

NONE

NONE

33-104-41

W 1/4

NONE

 

2018 SET CAPPED REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SET PK IN PP NE 37.76’

SET 3/8” REBAR SE 71.63’

SET 3/8” REBAR W 27.90’

33-104-41

SW

STONE IN 1952 (PLACED WOOD STAKE),

PLACED 11" BRIDGE PIN IN 1990,

PLACED STL PIN IN 1991 (AFTER GRADING)

2006 – LOCATED 5/8” REBAR AT INTERSECTION OF ASPHALT AND GRAVEL ROADWAYS. – ULTEIG ENGINEERS INC.

CORNER CERTIFICATE

 

PLACED PK NAIL AFTER OVERLAY, 2017

1991
N&D IN PP     S.E.  58.05'
TOP OF UGTCM     N.W.  56.13'
"X" IN CONC CULV     N.E.  68.25'

2006 – ULTEIG ENGINEERS INC.

STEEL CULVERT MARKER POST  N.E.   70.6’

STEEL BOLT IN STEEL STREET SIGN POST  S.E.   44.3’

STEEL BOLT IN STEEL STOP SIGN POST  N.W.   52.2’

NOBLES COUNTY COORDINATES

N = 195277.17

E = 546759.34

2017 NOBLES COUNTY COORDINATES     N=195277.13       E=546759.30

33-104-41

S 1/4

PLACED 11" BRIDGE PIN IN 1990,

PLACED STL PIN IN 1991 (AFTER GRADING)

2006 –LOCATED PK NAIL IN ASPHALT ROADWAY, LOCATED 11” BRIDGE PIN BENEATH PK NAIL. - ULTEIG ENGINEERS INC.

CORNER CERTIFICATE

 

PLACED PK NAIL AFTER OVERLAY, 2017

1991
N&D IN FE POST     N.  49.90'
"X" IN CS CULV     S.  40.37'
"X" IN CS CULV     S.W.  51.88'

2006 – ULTEIG ENGINEERS INC.

NAIL AND DISC IN FENCE POST  N.   49.9’

“X” CHISELED ON EAST END OF C.M.P.  S.S.W.   40.4’

“X” CHISELED ON WEST END OF C.M.P. S.W.

NOBLES COUNTY COORDINATES

N = 195247.36

E = 549404.87

2017 NOBLES COUNTY COORDINATES     N=195334.24       E=549402.73

33-104-41

CENTER

NONE

NONE

34-104-41

W 1/4

NONE

 

FD IRON PIPE (2013)

 

2018 FOUND IRON PIPE – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

NONE

 

2018

SET 3/8” REBAR NW 35.33’

SET 3/8” REBAR NE 33.23’

SET 3/8” REBAR SE 34.38’

34-104-41

SW

STAKE IN 1937,

STONE WITH STAKE IN 1951,

PLACED 3/4" x 18" REBAR IN 1990,

PLACED STL PIN IN 1991 (AFTER GRADING)

2006 – LOCATED 1” IRON ROD IN ASPHALT AT INTERSECTION OF PAVED AND GRAVEL ROADWAY. ULTEIG ENGINEERS INC.

CORNER CERTIFICATE

 

IRON MONUMENT INPLACE (2013)

 

PLACED PK NAIL AFTER OVERLAY, 2017

 

2018 FOUND PK NAIL – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

1991
N&D IN PP     S.E.  57.97'
"X" IN CS CULV     S.W.  48.15'
TOP OF UGTCM     N.W.  64.56'

2006 – ULTEIG ENGINEERS INC.

PK NAIL IN WOOD POST  N.W.   65.9’

BOLT IN STEEL SIGN POST  N.E.   80.6’

PK NAIL IN WOOD POWER POLE  S.E.   58.2’

NOBLES COUNTY COORDINATES  N = 195366.74  E = 552045.50

2017 NOBLES COUNTY COORDINATES     N=195366.65       E=552045.48

 

2018

CENTER OF TELE PED NW 65.39’

SET PK IN PP SE 58.19’

FOUND X IN CULVERT SW 48.20’

34-104-41

S 1/4

PLACED 11" BRIDGE PIN IN 1990,

PLACED STL PIN IN 1991 (AFTER GRADING)

FD 5/8” IRON MONUMENT.

PLACED PK NAIL AFTER OVERLAY, 2017

 

2018 FOUND PK NAIL – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

"X" IN CS CULV     N.W.  54.35'
"X" IN CS CULV     N.E.  54.76'
"X" IN CS CULV     S.E.  52.80'

2017 NOBLES COUNTY COORDINATES     N=195378.42       E=554692.89

 

2018

FOUND X IN CULVERT NW 53.88’

SET PK IN CULVERT NE 54.76’

FOUND X IN CULVERT SE 52.80’

34-104-41

CENTER

NONE

NONE

35-104-41

W 1/4

STONE IN 1937,

FOUND NOTHING IN 1978 (ASSUMED & PLACED IRON PIN)

 

2018 FOUND REBAR – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

N&D IN COR FE POST     W.  34.86'
N&D IN COR FE POST     E.  33.95'

 

2018

FOUND PK IN POST NW 42.74’

SET PK IN POST NE 35.02’

SET PK IN CMP SE 36.40’

35-104-41

SW

STONE IN 1937,

STONE IN 1951 (PLACED WOOD STAKE),

PLACED 11" BRIDGE PIN IN 1990,

PLACED STL PIN IN 1991 (AFTER GRADING)

PLACED PK NAIL AFTER OVERLAY, 2017

 

2018 FOUND PK NAIL – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

1991
N&D IN PP     S.W.  59.81'
N&D IN PP     S.E.  60.71'
TOP OF UGTCM     N.W.  66.50'

2017 NOBLES COUNTY COORDINATES     N=195390.47       E=557328.69

 

2018

SW COR OF ELEC BOX NNW 74.34’

SET PK IN TELE POST NW 106.81’

SET PK IN CULVERT SW 48.39’

35-104-41

S 1/4

PLACED 11" BRIDGE PIN IN 1990,

PLACED STL PIN IN 1991 (AFTER GRADING)

PLACED PK NAIL AFTER OVERLAY, 2017

 

2018 FOUND PK NAIL – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

1991
"X" IN CS CULV     S.W.  40.51
"X" IN CS CULV     N.E.  52.38'
"X" IN CS CULV     N.W.  49.48'

2017 NOBLES COUNTY COORDINATES     N=195427.76       E=559970.82

 

2018

FOUND X IN CULVERT NW 49.45’

FOUND X IN CULVERT NE 53.11’

FOUND X IN CULVERT SE 40.17’

35-104-41

CENTER

NONE

NONE

36-104-41

W 1/4

STONE IN 1919 (SET),

STONE IN 1923,

STONE IN 1953 (PLACED WOOD STAKE),

STAKE IN 1961,

COULD NOT FIND IN 1980,

STAKE IN 1992 (PLACED IRON PIN),

PLACED 1 3/4" PK NAIL IN 1992 (AFTER OVERLAY)

PLACED PK NAIL AFTER OVERLAY, 2017

 

2018 FOUND PK NAIL – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

1992
N&D IN FE POST     E.  51.77'
N&D IN FE POST     E.S.E.  51.26'

2017 NOBLES COUNTY COORDINATES     N=198110.15       E=562635.23

 

2018

SET PK IN CMP NW 33.97’

SET PK IN PP SE 121.49’

SET PK IN CMP SW 43.91’

36-104-41

SW

STONE IN 1919 (SET),

STONE IN 1923,

STONE IN 1937,

STONE IN 1953,

STONE IN 1959 (PLACED WOOD STAKE),

STAKE IN 1961 (PLACED IRON PIN),

IRON PIN IN 1980,

FOUND IRON PIN IN 1992,

PLACED 1 3/4" PK NAIL IN 1992 (AFTER OVERLAY)

PLACED PK NAIL AFTER OVERLAY, 2017

 

2018 FOUND PK NAIL – WESTWOOD PROFESSIONAL SERVICES

CORNER CERTIFICATE

1992
N&D IN COR FE POST     S.W.  72.42'
N&D IN PP     S.E.  69.55'
TOP OF UGTCM     N.W.  67.78'

2017 NOBLES COUNTY COORDINATES     N=195462.61       E=562618.94

 

2018

SE COR OF TELE PED NW 66.70’

SW COR OF TELE PED NE 70.28’

NW COR OF ELEC BOX SE 69.97’

36-104-41

S 1/4

STAKE IN 1959,

IRON PIN IN 1961,

PLACED 11" BRIDGE PIN IN 1992,

PLACED 3/4" X 18" REBAR IN 1992 (AFTER GRADING),

PLACED 3/4" X 4" REBAR IN 1994 (AFTER PAVING)

 

PLACED 2 1/2" PK NAIL IN 2018 (AFTER OVERLAY)

1994
"X" ON FE ENT CULV     N.  41.97'
"X" ON FE ENT CULV     N.W.  54.73'
"X" ON FE ENT CULV     S.E.  48.53'
"X" ON FE ENT CULV     S.W.  49.55'

 

N=195501.974’   E=565245.307’

36-104-41

SE

STONE IN 1919,

STONE IN 1937,

STONE IN 1959 (PLACED WOOD STAKE),

IRON PIN IN 1961,  

FOUND Ύ” IRON ROD (15” DEEP) – SET Ύ” O.D. X 24” I.P. ON E. EDGE OF ROD WITH TOP OVER TOP OF ROD (4” DEEP) IN 1992 BY MADSEN SURVEYING

1992 (MADSEN SURVEYING)

BC IN PP     S.W.  48.05’

CL TEL PED     N.E.  44.70’

36-104-41

E 1/4

STONE IN 1919 (SET), 

FOUND A 12” X 8” X 7” STONE  (30” DEEP) – SET Ύ” O.D. X 24” IRON MON. OVER STONE IN 1992 BY MADSEN SURVEYING

1992 (MADSEN SURVEYING)

SPK IN COR FE POST     W.  17.40’

(FENCE IS IN LINE)

36-104-41

CENTER

NONE

NONE